Supervisor construction inspector with 30+ years of underground utility experience and more than 10 years with H2O Urban Solutions as a field engineer and inspector. Provides practical oversight of water mains, services, hydrants, tanks, pump stations, wells, treatment facilities, shutdowns, temporary systems, and emergency work. Known for thorough documentation, constructability problem-solving, public coordination, and protecting water quality and continuity of service.
FOREST LAKE TANK NO. 1 REHABILITATION | California American Water, PEbble Beach, CA
Inspected tank rehabilitation work, including a temporary 6-inch HDPE highline, tank draining, and below-grade 30-inch ductile iron piping. Observed residual monitoring, pipe wrapping, backfill and compaction, temporary piping, site access, and contractor labor, equipment, and progress.
BIRP BACKWASH SYSTEM IMPROVEMENTS | California American Water, Monterey County, CA
Provided field oversight for backwash waste pond work and associated system improvements at the water treatment Observed pond draining, sludge removal by vacuum trucks and skid-steer, off-haul, washdown, site access, housekeeping, and daily production.
HIDDEN HILLS–TIERRA GRANDE INTERCONNECT, PHASE 2 | California American Water, Monterey County, CA
Inspected an approximately 2,950-foot, 8-inch DR14 C900 interconnect with ductile iron transitions, valves, tees, restraints, and appurtenances.
RANCHO CAÑADA VILLAGE DEVELOPMENT | California American Water, Carmel Valley, CA
Inspected 12- and 8-inch DR14 C900 and ductile iron water mains serving a major residential development.
ENCINA DRIVE + CALLE DE LA VENTANA MAIN REPLACEMENT | California American Water, Carmel Valley, CA
Inspected replacement of approximately 1,400 feet of 8-inch DR14 C900 water main with hydrants, services, valves, tees, elbows, and restraints.
SEPTEMBER RANCH DEVELOPMENT | California American Water, Monterey County, CA
Inspected a development water system including tank and well work and 12-, 8-, 6-, and 4-inch DR14 C900 distribution piping.
BEGONIA WELL NO. 3 EQUIPPING | California American Water, Monterey County, CA
Inspected well pedestal and equipment-pad construction, reinforcing steel, casing and sounding tubes, concrete, and electrical conduit installation.
BAYONET WELLS 1 & 2 PIPELINE EXTENSIONS | California American Water, Seaside, CA
Inspected 12- and 16-inch ductile iron raw-water and pump-to-waste pipeline extensions connecting the extraction wells to the treatment system.
SCENIC DRIVE BRIDGE-CROSSING MAIN REHABILITATION | California American Water, PEbble Beach, CA
Inspected utility potholing and tie-ins for an 8-inch bridge-crossing main rehabilitation using C900, restrained fittings, offsets, and couplings.
LUZERN GAC FILTER UPGRADES | California American Water, Monterey County, CA
Inspected temporary treated- and raw-water lines, sampling, vault and piping demolition, excavation benching, thrust- block removal, and backfill.
CANNERY ROW WATER SYSTEM REPLACEMENT | California American Water, Monterey, CA
Inspected more than 1,700 feet of main, 43 commercial services from 1 to 6 inches, meter and backflow work, fire services, and five hydrants.
CARMEL WOODS BOOSTER PUMP STATION IMPROVEMENTS | California American Water, Carmel, CA
Inspected retaining-wall pier excavation, structural support work, booster-station pad preparation, drainage piping, and associated civil improvements.
RYAN RANCH WATER TREATMENT PLANT ABANDONMENT | California American Water, Monterey, CA
Inspected demolition and removal of filter tanks, treatment piping, concrete, and site utilities, including salvage of designated equipment and structures.
DOLORES STREET COMMERCIAL WATER MAIN REPLACEMENT | California American Water, Carmel, CA
Inspected potholing and installation of 8-inch DR14 C900 water main, valves, tees, service saddles, corporation stops, and commercial fire-service connections.